In Eastern Idaho, the answer depends on county zoning: the land's zoning classification, lot size, and the county's land use ordinances. Both Bonneville and Jefferson counties regulate second dwellings and accessory dwelling units (ADUs) on agricultural land, and a conditional use permit or another approval is often required before one is allowed. I tell buyers to treat it as a zoning question first, pull the parcel's zone, read the county's rules, and confirm the details with the planning office before making an offer.

How agricultural zoning works in Bonneville and Jefferson counties

Agricultural zoning exists to keep farming viable by limiting what can be built on productive land, and each county runs its own system. In Bonneville County, the rules live in Chapter 156 of the Bonneville County Code, and the A-1 Agricultural zone is the workhorse district: the article begins at Section 156.125 with permitted uses at Section 156.126, and the zone carries its own standards for area, width, and yards (Sections 156.129 through 156.131). There is also a second agricultural-style district and an RA-2 Residential Agricultural zone, so the exact rules follow the exact zone on the parcel, never the seller's description of the place.

Jefferson County organizes things a little differently, with three agricultural districts in Chapter 112 of its code: AG-10 (Section 112-191), AG-20 (Section 112-192), and AG-40 (Section 112-193). The numbers are the minimum lot sizes. Per the dimensional table at Section 112-263, an AG-10 lot must be at least 10 acres, AG-20 at least 20 acres, and AG-40 at least 40 acres, and residential density is capped at one single-family dwelling per minimum lot size. The two counties share the same logic, but the numbers are theirs, not a statewide standard, which is the first reason a zoning answer from one county tells you nothing about the other.

The zoning ordinance, minimum lot sizes, and the comprehensive plan

Three documents shape the answer for any parcel. The zoning ordinance, Chapter 156 in Bonneville and Chapter 112 in Jefferson, is the binding one: it assigns every parcel a zone, lists what is allowed in that zone without a hearing, what needs a conditional use permit, and what is simply not allowed. Minimum lot sizes sit in the same document, and they matter twice for a second home: the parcel must be large enough to hold the dwellings it will carry under the density rules, and a lot that is already undersized may not qualify for a building permit even for the first house.

The comprehensive plan is the longer-range document that describes where the county wants growth to go, and the planning commissions and county commissioners use it as the backdrop when they weigh individual applications. A parcel's zone comes from the official zoning map, not from the county line on a real estate site, so the first step for any buyer is to confirm the zone in writing for the exact legal description, township, range, and section.

When a second dwelling or ADU is allowed, and when it needs a permit

In Jefferson County the rules are spelled out. Section 112-371 allows one accessory dwelling unit per lot or parcel where the zone district permits it, the ADU may be attached to the single-family dwelling, and in some situations an ADU can even be the first residence on a property if it meets the section's requirements. Beyond one ADU, the density table at Section 112-263 sets the ceiling at one dwelling per minimum lot size, and a footnote permits up to three single-family dwellings on a single parcel when the parcel is large enough, so a second home is possible, but the acreage has to support it.

Bonneville County takes a similar shape, but its published code is less turnkey about second dwellings on agricultural land, and I will not pretend otherwise. The ordinance provides conditional use permit procedures at Section 156.013, and the A-1 article includes standards controlling use hearings at Section 156.128, which tells you the county evaluates certain uses in agricultural zones case by case. Whether a particular parcel's second dwelling or ADU is a permitted accessory use, a conditional use, or something needing a variance depends on the zone and the parcel, and the honest answer is to confirm it with the county's Planning and Zoning office.

The general pattern, and where the two counties line up: a genuinely accessory dwelling tied to an existing residence on a properly sized lot is far more likely to be handled as a permitted use, while a freestanding second home, a dwelling on a small or nonconforming lot, or any use that stretches the zone's intent usually walks into the conditional use permit process. If a requested use cannot be made to fit even under a CUP, a variance is the harder route: variances are only granted for hardships tied to the land itself, never for the owner's convenience.

What applications and fees are typically involved

The application goes to the county's planning department, not to the state. In Bonneville County, submit through the Planning, Zoning & Building Department at 357 Constitution Way in Idaho Falls and the county's online permitting portal, with the Planning and Zoning Commission hearing the case. In Jefferson County, the Conditional Use Permit application is available from the Planning, Zoning & Building Department at 210 Courthouse Way in Rigby or from the county's permits page at jcgov.us.

Fees are set by the county commissioners in each county's fee resolution, not by the ordinance itself. Bonneville County's current fees come from the commissioners' fee resolution (2025 Resolution 25-19); Jefferson County's come from Resolution 2026-18, and its CUP application references the current fee schedule. Older Bonneville hearing notices have referenced a base filing fee plus the cost of certified letters and publication, and the current dollar figure for either county is a one-call question: Bonneville at (208) 524-7920, Jefferson at (208) 745-9220.

How the process works, step by step

The conditional use permit process follows the same arc in both counties, with the schedule set by each county's calendar. You submit a complete application with the site plan, septic and water information, and the fee; planning staff review it for compliance with the ordinance; and the case is scheduled for public notice and a hearing before the Planning and Zoning Commission, with the board of county commissioners handling appeals.

Public notice is the part buyers underestimate. Jefferson County requires newspaper notice at least 15 days before the hearing and on-site posting at least a week ahead, and its Planning and Zoning Commission meets monthly, typically the third Wednesday, so the calendar runs on roughly one-month cycles. Bonneville County sends notice by certified letter and publication, and its commission meets on Wednesday evenings. Neighbors and other interested parties get a chance to speak at the hearing, and the commission can approve, approve with conditions, or deny the application. In Jefferson County, an approved permit without a stated time limit expires after two years if the use is not established (Section 112-87), so an approval is not a blank check you can sit on forever.

Common conditions attached to approvals

Approvals rarely come with no strings. The conditions you will see most often in rural Eastern Idaho come back to the same four systems:

  • Septic capacity. The property must handle another dwelling's wastewater. A second home usually means a second or expanded septic system, and the site has to pass soil and setback requirements reviewed by the Eastern Idaho Public Health District.
  • Well yield or water right. A new dwelling needs a reliable water supply. If the plan calls for a new well, Idaho's domestic exemption covers up to 13,000 gallons per day and half an acre of irrigation, but areas with restricted groundwater can complicate a new well, so the water question gets verified early in the process.
  • Road access. The county will want legal access to the new dwelling that meets its road standards, which can mean an easement, a shared drive, or an improvement to the approach before a building permit is issued.
  • Deed restrictions and recorded conditions. Approvals are often recorded against the property, so the conditions run with the land: you might be limited to one ADU in perpetuity, or a CUP might be personal to the applicant. Read the recorded conditions before you buy, because they bind the next owner too.

Why you should verify everything before closing

The cheapest time to learn a parcel's limits is before you write the offer, and the most expensive is after you own it. A seller's "it's zoned for a second home" is not a zoning opinion, and a building that was put up without permits is a liability, not an asset. Ask for the zone in writing, check the county's records for existing permits and recorded conditional use permits, and have the county confirm whether a second dwelling or ADU is allowed on that exact parcel and what approvals it would take.

I walk buyers through this on every rural deal I work on, because the gap between "this looks like farm country" and "this parcel is legally approved for what you want to build" is where the surprises hide. If you are looking at acreage and want a second home, a shop with living quarters, or an ADU for family, bring the parcel's legal description to the conversation and we will get the zoning answers from the county before you commit. I am Melissa Holm with Hillside Realty, brokered by eXp Realty, and this is exactly the kind of thing I check on a buyer's behalf.

Official sources

Zoning rules and fee schedules change, so confirm the details that matter for your property with the county office named before you rely on them.

Questions buyers ask

Second homes and ADUs on ag land, answered straight.

Can I build an ADU on any agricultural lot?

No, not on any lot. Jefferson County allows one ADU per lot or parcel where the zone district permits it (Chapter 112, Section 112-371), and its agricultural zones carry minimum lot sizes of 10, 20, or 40 acres depending on the zone. Bonneville County's rules are in Chapter 156 of its code, and the specifics for its agricultural zones should be confirmed with the county's Planning and Zoning office for the exact parcel. Either way, septic capacity, well yield or water supply, and road access all have to work before a permit is issued.

Do I need a conditional use permit in Bonneville County?

Often yes for uses beyond the zone's permitted list. Bonneville County's zoning ordinance (Chapter 156) sets out conditional use permit procedures at Section 156.013, and the A-1 Agricultural zone article includes standards controlling use hearings at Section 156.128, which is the county's signal that certain agricultural uses get a case-by-case hearing. Whether a specific second dwelling or ADU on a given parcel needs a CUP depends on the zone and the parcel, so confirm with the Planning and Zoning office at (208) 524-7920 before you rely on it.

What is the minimum lot size for a second home in Jefferson County?

Jefferson County's three agricultural zones require minimum lot sizes of 10 acres (AG-10), 20 acres (AG-20), and 40 acres (AG-40) under Section 112-263, with residential density capped at one single-family dwelling per minimum lot size. A footnote in the same section permits up to three single-family dwellings on a single parcel where the parcel is large enough. The exact acreage that allows a second dwelling should be confirmed with the county's Planning, Zoning and Building department at (208) 745-9220.

Do farm buildings count toward dwelling limits?

No. Barns, sheds, and other farm buildings are not dwellings, so they do not count against the number of dwelling units a parcel may have. They still usually need building permits and must meet setbacks and other standards, and a farm building cannot legally be used as a residence unless it is approved as one. If a listing shows a converted shop or barn as living space, verify that it was permitted as a dwelling.

How long does a conditional use permit take?

There is no fixed state timeline. Bonneville County staff review the application and schedule a public hearing before the Planning and Zoning Commission, with a typical range of 30 to 60 days depending on completeness and the hearing calendar. Jefferson County hears cases at its monthly Planning and Zoning Commission meetings, with public notice required at least 15 days ahead, so plan on roughly one monthly cycle, a few weeks to about two months. Ask the office for the next available hearing date when you submit.

These answers are general guidance, not legal advice. Your specific parcel deserves its own check with the county office, which is part of the research I do on every acreage deal.

Zoning answers start with the county. Your parcel's details are where I earn my keep.

Guides are general. The zoning answers for your exact parcel come from the county office, and I will help you get them in writing. Melissa Holm, Hillside Realty, brokered by eXp Realty.

Free buyer's checklist

The Eastern Idaho Acreage Buyer's Checklist

This is the same list I work through with acreage buyers, and I will send you a printable copy by email. It covers the questions most buyers miss: water rights, canal shares, wells, septic, zoning, access, winter roads, fencing, and utilities, with the official sources to verify each one.

  • Water rights, priority dates, and canal shares
  • Wells, flow rates, and water testing
  • Septic, county zoning, and building rules
  • Access, easements, and winter roads
  • Fencing, outbuildings, and utilities
Read the full checklist online

Get it by email

Tell me where you are in the process, and I will send the printable checklist to your inbox.

Your details go straight to me, never to a third party. No spam, no mailing list.

Want to talk it through?

A quick call can settle the questions on your list.

Guides cover the general picture. Your property deserves its own conversation, and a 15-minute call is a good place to start. I will call you at the number you provide, and there is never any pressure.